Posted: 01 Sep 2012 01:20 PM PDT

Omega Pandora operational, POS to surface stable, compression grid activated to LOGN5.9. Master delta LOC in progress. Isidic security breach deflected, HVBN stable, systems security breach in deflection. M increase to 1.5, Dreamland attempt in progress.